Stephenson Ave - A novel approach to launch, slide and lower
About
This presentation highlights the technical design and construction challenges of achieving the 42m wide trafficable surface with a slender 1.8m structural super structure depth.Date
Thursday 14 May 2026 5:30 PM - 8:00 PM (UTC+08)Location
Shoe Bar and Cafe
Yagan Square, 376 Welling ton Street, Perth WA 6000